We rent concrete barriers for work zones and staging areas across Manhattan, Brooklyn, Queens, the Bronx and Staten Island. When the job ends, we come back for them.
Hitech rents precast concrete jersey barriers, the sloping concrete wall sections you see along work zones and lane closures.
Most of our barrier rentals go to jobs like these:
Barriers on a public street or sidewalk may need DOT permits, depending on where they sit and how much space they take. We plan each barrier line around your driveways and site entrances, and around whatever traffic runs past. See the permit rules below for what applies.
From your first call to the last pickup:
No barrier count yet? We work it out from the length of the run. The team that quotes your job stays on it until pickup.
Our crew brings the barriers to the site and sets each one in the layout we agreed on.
Work zones change. If the barrier line needs to move after a utility cut or a change in site access, call us to arrange repositioning.
At the end of the rental we lift every barrier out and leave the spot clear.
We also put up scaffolding and sidewalk sheds in NYC. Barriers usually go in beside them.
Barriers handle vehicles. Where people walk past, add a temporary fencing rental to your quote.
Shed posts and scaffold bases near the curb sit a few feet from passing trucks. Where your approved site layout calls for it, a barrier line can separate the curb lane from those bases. If we’re building your shed too, the barriers go in on the same job.
Adding fencing or a shed? List it in your request.
A jersey barrier rental on a public street or sidewalk means NYC Department of Transportation (DOT) permits may apply.
| Where the barriers go | What usually applies |
|---|---|
| On the street | Placing or storing construction equipment on a public street can require a DOT Building Operations & Construction Activity Permit. The applicable permit depends on the placement and use. |
| On the sidewalk | DOT may require an Occupancy of Sidewalk Permit if the barriers obstruct more than three feet from the property line or leave less than five feet of clear pedestrian passage. Your permit stipulations may add conditions. |
| On a private lot | No street permit for the barriers themselves. If the delivery truck crosses a sidewalk with no approved driveway or dropped curb cut, DOT requires a sidewalk crossing permit. |
Under DOT’s Highway Rules, each of these takes its own permit:
For construction activity involving building operations, the general contractor or construction manager obtains the required permit.
Applications go through NYCStreets, where registered permittees apply, pay and print. If your GC already holds the permit, send it with your quote request and we’ll plan the barrier placement around its stipulations. Unsure what your location needs? We’ll go through it with you when we quote.
Five things set the price:
Send the address, the count or length, and your dates, and we’ll itemize each of these in your quote.
Permit or placement question about your site? Call (929) 837-3852 with the address handy.
We quote a rental period from the start and end dates you send. If the job runs long, call us before the end date.
Often. DOT groups equipment placed on a street or sidewalk under its construction activity permits, so many barrier placements need one. The exact answer depends on where the barriers sit, so send us the address. Closing a lane takes its own permit.
A sidewalk placement may also need an Occupancy of Sidewalk Permit if the barriers obstruct more than three feet from the property line or leave less than five feet of clear pedestrian passage. Your permit stipulations may add conditions. For building operations, the general contractor or construction manager applies through NYCStreets.
Yes. We can put up temporary fencing along with the barriers.
The length of the line, the rental period, site access, permits and any moves during the job. Each one is its own line in your quote.
No, we rent only. Every rental includes delivery, placement and pickup. You never haul or store a barrier.
It depends on the location. Your DOT permit stipulations set what the line needs, and we plan the layout around them. We can supply and place lights and signs on request.
The address, the number of barriers or the length of the line, and your start and end dates. Tell us whether they go on a street, a sidewalk or a private lot, and mention fencing if you need it.
Hitech Sidewalk Shed & Scaffolding has served NYC since 2007 and carries $2M in general liability insurance. See all of our NYC services.